Wednesday, March 22, 2006

Salon Bridge Station

For another fun winter project, I pulled the bridge station out of the salon and hauled it up to the workshop. It stands about the height of a lecturn.



It was in fairly rough shape, with a fair amount of water staining. I stripped the surviving varnish, bleached it several times, then pulled the screws from each section to remove it from the black interior frame. I painted the frame, then stained and varnished the mahogany pieces. The finished result turned out nicely.



I've given it a place of honor in the workshop. The instruments and panels are next.

0 Comments:

Post a Comment

<< Home